×

Procedure Areas Expansion Project Phase – 1 KFCA Bahrain Side

Start: Jan 2023 | Finish: Apr 2024
Status: Ongoing

Location:

King Fahd Causeway, Bahrain Side

Contract Type:

Client:

King Fahd Causeway Authority

Client Consultant:

Design Consultant:

Project Description:

Project to expand the capacity of Passengers on the causeway from 1800 to 2500
Vehicle/Hour-Bahrain Side. By adding more booth cabins on both the departure
and arrival side

Work Include:

a. Demolishing a total of (54) existing cabins, utility connections,
and parts of the existing security fence, to expand the passenger’s procedures.

b. Construction of a total of (100) New Cabins, facilities, and buildings
on the departure and arrival side. Including Immigration (69), Electrical (6),
Multifunctional (5), Toilets (4), Prayer Rooms (2), Female Facilities (2),
Finger Print Rooms (6) and Customs Cabins (6).

c. Enclosed structural pedestrian footbridge of 55 Mtr length and 5.5 Mtr
Height to connect the existing Parking Area with the Main Spine. Including
Finishes, Lighting, Stairways, and 2 panoramic view Elevators.

d. 6 Mtr Height Structural Canopies covering 11,000 M2 of area above the Cabins.

e. Construction of a new fence for the expanded secured procedures

f. Site Development & Asphalt Paving and Traffic Signages.

What our clients say about us?

• Good planning, coordination and execution of activities, work processes and critical operation. Good effort made to keep on schedule.
• Excellent management structure and reporting procedure.
• HSE representative has good knowledge and experience. Performance was above the acceptable standard.
Conclusion: General Performance exceeds expectations.

Dr. Engr. Salah Attia Abdelzaher

Director Projects JODC (Director of infrastructure and MEP)

Jabal Omar Development Company

Impressed with the project team’s expertise and hands on experience with road projects.

They have consistently delivered against project objectives and proved as most reliable construction partner.




Khaled El Kholy

Project Engineer

Umm Al Qura for Development & Construction

Always delighted to work with Shade team; our trusted EPC partner.

Their proactive approach has added value to each stage of the development and we have always been able to rely on their team to provide a very high quality, cost effective and robust results.



Ahmed Basiony

Project Manager

Nesma & Partners

The staff employed by Shade for the project, have supported us to deliver a challenging scheme on time, budget, quality and specification, which has resulted in us keeping promise of delivering key infrastructure for Makkah on time & budget.





Mostafa Sayed

Project Manager

Jabal Omar Development Authority

To have qualified construction partner as Shade, is key for the success of the project, especially something as complicated as Bridge road E.

Their competent site team supported us in execution as well as their planning process contribute to on time delivery



Amro Khatab

Project Manager

Khatib & Alami

  • Share:

Want to start new project?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nunc finibus nisl cursus, consequat felis non, lobortis velit. Vestibulum purus nisl, vehicula vitae nulla non, vulputate eleifend nulla. In hendrerit convallis lobortis.

CONTACT US
SHADE CORPORATION LTD.

P.O. Box 7027 Dammam 31462 Saudi Arabia Building No. 5222 Ad Dammam 32414-6124.