Replace and Automate Existing Wells and New Wells in different locations in Dhahran.
a. Drilling three (3) new wells in new locations.
b. Replacing two (2) existing wells by drilling new wells in the same area.
c. Upgrading seven (7) existing wells.
d. Demolish three (3) existing wells.
e. Install a new transmission pipe line connecting the new wells and tie-in this
new pipe line with the existing header.
f. Provide 3G connectivity to transport the automation data from RTU’s. In addition,
the project shall supply and install electrical, process, automation equipment and
software to allow for.
• Power supply for the new pumps, task lighting and other power demand required for the project
• Remote monitoring, automatic control and protection of the water wells.
• Remote monitoring and automatic control of level in raw water tanks
• Transfer of existing control functions from raw water control room to drinking
water plant control room.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nunc finibus nisl cursus, consequat felis non, lobortis velit. Vestibulum purus nisl, vehicula vitae nulla non, vulputate eleifend nulla. In hendrerit convallis lobortis.
CONTACT USP.O. Box 7027 Dammam 31462 Saudi Arabia Building No. 5222 Ad Dammam 32414-6124.
© 2024 Shade Corporation Ltd. All rights reserved.