The project objective is to develop Main Sewer Pumping Station, Retention Pond and pipeline works to connect Treated Sewer Effluent Pumping Station at MODON.
• Main Sewer pump station for sewer discharge volume generated at SPARK phase 1.
• Sewer force main from MSPS to MODON industrial zone for discharge or raw ser to MODON WWTP.
• TSE water transfer pump station inside MODON industrial zone and TSE force main from MODON industrial zone to SPARK irrigation storage tank.
• Interfaces and connections with existing services including power supply connections.