The project objective is to supply the drinking water to the Dhahran residential community. The work to be performed is to install pipeline from SWCC tie-in point to the Saudi Aramco newly constructed Water Storage Tank.
• 24 inch pipeline connected from the SWCC main line to Abu Hadriyah road to Saudi Aramco Water Storage tank area.
• Fiber optic cable installation from SWCC to tie-in point and from tie-in point to Tank area.
• Construction of 24m diameter water storage tank.
• Construction of Control Shelter
• Power supply & lighting works
• Installation of PLC, SCADA, Transmitters & Gauges.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nunc finibus nisl cursus, consequat felis non, lobortis velit. Vestibulum purus nisl, vehicula vitae nulla non, vulputate eleifend nulla. In hendrerit convallis lobortis.
CONTACT USP.O. Box 7027 Dammam 31462 Saudi Arabia Building No. 5222 Ad Dammam 32414-6124.
© 2024 Shade Corporation Ltd. All rights reserved.