Location:
Contract Type:
Client:
Client Consultant:
Design Consultant:
Construction of bridges and tunnels for the municipality cities crossroads for 1434-1435 - Crossroad Bridge of Prince Naif road with Imam Ali Abu Talib Road.
• Installation of 2 km of pressure pipeline 1100 mm and tieit in with existing network.
• Installation of 1.5 km of pressure pipeline 300 mm and tie it in with existing network.
• Approximately 2800 LM of utilities remova;l and relocation
• Around 20,000 m3 backfilling
• More than 5000 m3 of concrete work for foundations, retaining walls, abutment, piers and cross beams
• 27 Girders on 8 spans and 1760 m3 of concrete for precast post-tensioned girders. 244 LM length of bridge
• 1500 Im of New Jersey barriers
• More than 2500 m2 of cladding work
• More than 1800 tons of steel
• More than 20000 m2 of asphalting work
• Around 10000 m2 of landscaping work
• 66 lighting poles and one substation with all related work
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nunc finibus nisl cursus, consequat felis non, lobortis velit. Vestibulum purus nisl, vehicula vitae nulla non, vulputate eleifend nulla. In hendrerit convallis lobortis.
CONTACT USP.O. Box 7027 Dammam 31462 Saudi Arabia Building No. 5222 Ad Dammam 32414-6124.
© 2024 Shade Corporation Ltd. All rights reserved.